A structured CAP framework aligned to WRAP audit format — document findings, assign ownership, set remediation deadlines, and track closure through verification.
The PASA Corrective Action Plan is a structured working document aligned to the format and expectations of the WRAP audit corrective action process. It is designed to be completed following a PASA Self-Assessment or professional gap assessment — capturing each non-conformance finding, the corrective action required, the responsible party, the target completion date, and the verification method. This document may be presented to a WRAP-registered monitor as evidence of active remediation.
A Corrective Action Plan is not a compliance formality — it is a management tool. The most important thing a facility can do after identifying a compliance gap is assign it an owner, a deadline, and a verification method. Gaps with no owner do not close. The PASA CAP enforces exactly that discipline: every finding has a named responsible party, a risk classification, a specific corrective action, and a date by which that action must be verified complete.
How to use this document: Complete the Facility Information block first. Then transfer each gap identified in your PASA Self-Assessment into the CAP table — one row per finding. Score each finding's risk level, define the corrective action required, assign a responsible owner, and set a realistic remediation deadline. Update the Status column as corrective actions are implemented and verified. Present to your compliance monitor or leadership team at your next review.
| WRAP Principle / Ref # | Finding / Non-Conformance | Risk Level | Required Corrective Action | Responsible Party | Due Date | Status | Verification Evidence |
|---|---|---|---|---|---|---|---|
P2 — Forced Labor |
Worker document retention or deposit arrangements identified PASA Item 2.2 |
Critical |
|||||
P3 — Child Labor |
Age verification documentation missing or incomplete at hire PASA Item 3.2 / 3.3 |
Critical |
|||||
P4 — Harassment |
Anti-harassment policy absent or not posted in worker language PASA Item 4.1 |
High |
|||||
P4 — Harassment |
Grievance procedure not documented or not communicated to workers PASA Item 4.2 |
High |
|||||
P7 — Discrimination |
Non-discrimination policy missing or training records absent PASA Item 7.1 / 7.2 |
High |
| WRAP Principle / Ref # | Finding / Non-Conformance | Risk Level | Required Corrective Action | Responsible Party | Due Date | Status | Verification Evidence |
|---|---|---|---|---|---|---|---|
P5 — Compensation |
Payroll records incomplete, inconsistent, or not retrievable PASA Item 5.1 / 5.2 |
Critical |
|||||
P5 — Compensation |
Wage statements not provided to workers each pay period PASA Item 5.3 |
High |
|||||
P6 — Hours |
Time and attendance records incomplete or gaps identified PASA Item 6.2 |
Critical |
|||||
P6 — Hours |
Rest periods or meal breaks not documented or not compliant PASA Item 6.3 |
Medium |
| WRAP Principle / Ref # | Finding / Non-Conformance | Risk Level | Required Corrective Action | Responsible Party | Due Date | Status | Verification Evidence |
|---|---|---|---|---|---|---|---|
P8 — H&S |
Fire safety equipment not inspected or documentation not current PASA Item 8.2 |
Critical |
|||||
P8 — H&S |
Emergency evacuation drills not conducted or not documented PASA Item 8.3 |
Critical |
|||||
P8 — H&S |
Health and safety training records absent or not current PASA Item 8.5 |
High |
|||||
P8 — H&S |
Chemical handling, PPE, or equipment safety docs not current PASA Item 8.6 |
High |
| WRAP Principle / Ref # | Finding / Non-Conformance | Risk Level | Required Corrective Action | Responsible Party | Due Date | Status | Verification Evidence |
|---|---|---|---|---|---|---|---|
P10 — Environment |
Environmental permits expired or not current — wastewater, waste disposal PASA Item 10.2 |
High |
|||||
P11 — Customs |
Country-of-origin documentation incomplete or not maintained on file PASA Item 11.2 |
High |
|||||
P12 — Drug Policy |
Drug and alcohol policy not posted or training not documented PASA Item 12.1 / 12.3 |
Medium |
| WRAP Principle / Ref # | Finding / Non-Conformance | Risk Level | Required Corrective Action | Responsible Party | Due Date | Status | Verification Evidence |
|---|---|---|---|---|---|---|---|
RC2 Consulting works alongside facility teams to complete gap assessments, structure corrective action plans, and guide organizations through full remediation — from first finding to audit-ready closure.
Schedule a CAP Consultation →